Takt time
Translate customer demand and available production time into a required production rhythm.
Estimate average work in progress from average throughput and average flow time.
Estimate average work in progress from average throughput and average flow time.
rate*time unitsApplies to a stable system with consistent boundaries and long-run averages. This is not a prediction for an individual order or a rapidly changing backlog.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Estimate average work in progress from average throughput and average flow time. Use completed throughput and total time inside the same system. Waiting and processing time both belong in the flow-time measure.
Use completed throughput and total time inside the same system. Waiting and processing time both belong in the flow-time measure.
| Input | Example |
|---|---|
Average throughput (units/h) rate | 12 |
Average flow time (h) time | 2.5 |
Applies to a stable system with consistent boundaries and long-run averages. This is not a prediction for an individual order or a rapidly changing backlog.
Enter the displayed example values in their labelled units. Apply the formula before rounding; change one input at a time to compare scenarios.