Capacity utilization
Compare actual throughput with a stated capacity benchmark.
Translate customer demand and available production time into a required production rhythm.
Translate customer demand and available production time into a required production rhythm.
shift-breaks min(shift-breaks)*60/d s/unitd*60/(shift-breaks) units/hDemand and available time must cover the same period. Takt is a demand pace, not a measured cycle time, capacity promise or staffing prescription.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Translate customer demand and available production time into a required production rhythm. Subtract planned unavailable time once. Compare takt with observed cycle time to identify a mismatch before making operational changes.
Subtract planned unavailable time once. Compare takt with observed cycle time to identify a mismatch before making operational changes.
| Input | Example |
|---|---|
Scheduled shift time (min) shift | 480 |
Planned unavailable time (min) breaks | 30 |
Customer demand (units) d | 450 |
Demand and available time must cover the same period. Takt is a demand pace, not a measured cycle time, capacity promise or staffing prescription.
Enter the displayed example values in their labelled units. Apply the formula before rounding; change one input at a time to compare scenarios.