Capacity utilization
Compare actual throughput with a stated capacity benchmark.
Separate equipment losses into availability, performance and quality, then calculate OEE.
Separate equipment losses into availability, performance and quality, then calculate OEE.
100*t/p %100*c*n/(60*t) %100*g/n %100*c*g/(60*p) %Use one consistent production period and a verified ideal cycle. Good units exclude rework. Performance above 100% is rejected because it signals inconsistent inputs or an unsuitable ideal cycle.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Separate equipment losses into availability, performance and quality, then calculate OEE. Planned time excludes only time when production was not scheduled. Availability does not measure calendar utilization.
Planned time excludes only time when production was not scheduled. Availability does not measure calendar utilization.
| Input | Example |
|---|---|
Planned production time (min) p | 480 |
Run time (min) t | 420 |
Ideal cycle time (s/unit) c | 2 |
Total units produced n | 12000 |
Good units without rework g | 11400 |
Use one consistent production period and a verified ideal cycle. Good units exclude rework. Performance above 100% is rejected because it signals inconsistent inputs or an unsuitable ideal cycle.
Enter the displayed example values in their labelled units. Apply the formula before rounding; change one input at a time to compare scenarios.