Takt time
Translate customer demand and available production time into a required production rhythm.
Compare actual throughput with a stated capacity benchmark.
Compare actual throughput with a stated capacity benchmark.
100*actual/capacity %capacity-actual units/hThe benchmark and actual rate must use the same product mix, time basis and units. Actual output above the benchmark is rejected; revisit the benchmark rather than silently changing it.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Compare actual throughput with a stated capacity benchmark. State whether the denominator is design or effective capacity. This rate ratio is different from equipment availability.
State whether the denominator is design or effective capacity. This rate ratio is different from equipment availability.
| Input | Example |
|---|---|
Actual output rate (units/h) actual | 75 |
Chosen capacity rate (units/h) capacity | 100 |
The benchmark and actual rate must use the same product mix, time basis and units. Actual output above the benchmark is rejected; revisit the benchmark rather than silently changing it.
Enter the displayed example values in their labelled units. Apply the formula before rounding; change one input at a time to compare scenarios.