Translate a workload into shifts using the time available after breaks and other fixed overhead.
Translate a workload into shifts using the time available after breaks and other fixed overhead.
shift-breaks hfloor(work/(shift-breaks))ceil(work/(shift-breaks))ceil(work/(shift-breaks))*(shift-breaks)-work hUses identical shifts with no work carried across outside the scheduled capacity. Convert workload to person-hours first if allocating a team.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Translate a workload into shifts using the time available after breaks and other fixed overhead. A 17-hour workload with 7 productive hours per shift needs 3 shifts, leaving 4 productive hours unfilled.
A 17-hour workload with 7 productive hours per shift needs 3 shifts, leaving 4 productive hours unfilled.
| Input | Example |
|---|---|
Required productive time (hours) work | 17 |
Scheduled time per shift (hours) shift | 8 |
Nonproductive time per shift (hours) breaks | 1 |
Uses identical shifts with no work carried across outside the scheduled capacity. Convert workload to person-hours first if allocating a team.
Use the values in the worked example and keep consistent units throughout the calculation.