Workload in complete shifts
Translate a workload into shifts using the time available after breaks and other fixed overhead.
Estimate how many complete service tasks fit after one-time setup and closeout.
Estimate how many complete service tasks fit after one-time setup and closeout.
(available-setup+abs(available-setup))/2 minfloor((available-setup+abs(available-setup))/(2*task))Assumes a single workstream and a constant task duration. Parallel work and customer interruptions need a different capacity model.
Results are rounded for display; calculations use unrounded values. Read our calculation methodology.
Estimate how many complete service tasks fit after one-time setup and closeout. After reserving 30 minutes of a 240-minute period, 210 minutes remain. At 18 minutes each, 11 tasks fit.
After reserving 30 minutes of a 240-minute period, 210 minutes remain. At 18 minutes each, 11 tasks fit.
| Input | Example |
|---|---|
Available work period (minutes) available | 240 |
One-time setup and closeout (minutes) setup | 30 |
Time per completed task (minutes) task | 18 |
Assumes a single workstream and a constant task duration. Parallel work and customer interruptions need a different capacity model.
Use the values in the worked example and keep consistent units throughout the calculation.